Adey Steel Ltd have just completed a 350m long footbridge spanning across a disused Mill Pond in Crawley. The scope of works was to assist with design queries and to modify the original design to assist with erection on site. The design of the galvanised bridge was modular to allow for ease of building on site but at the same time architecturally needed to be of the highest quality.