Adey Steel has been instrumental in providing specialised piling solutions for significant rail infrastructure projects across the UK. Their expertise in fabricating and delivering tubular piles has been crucial in supporting the electrification and structural enhancements of key sites.
Old Oak Common (HS2)
At Old Oak Common, Adey Steel's tubular piles were utilised to support the installation of overhead line equipment (OLE) structures. These piles were integral to the electrification efforts, enabling the transition to electric train services and contributing to the project's goal of a fully electrified railway.
Poplar Central
In the Poplar Central area, Adey Steel supplied tubular piles that were used to support the installation of cantilever booms and masts for the OLE system. This work was part of the route electrification and decarbonisation efforts, facilitating the transition to electric train services and contributing to the project's goal of a fully electrified railway.
Wixams Station
For the new Wixams Station in Bedfordshire, Adey Steel provided tubular piles as part of the preparatory activities. These piles are essential in supporting the station's infrastructure, ensuring the stability and safety of the new facility.
Adey Steel's expertise in piling is instrumental in laying the groundwork for these transformative rail projects, ensuring structural integrity and supporting the UK's commitment to modernising its rail network.
To support the installation of this equipment, Adey Steel, operating a dedicated 30,000 square foot piling facility at its purpose-built headquarters in Loughborough, has fabricated, welded, tested and delivered some 500 plus tonnes of 610 x 16 CHS bossed piles.