Adey Steel Ltd have been involved from Design stage in supplying a 77m Conveyor Bridge to a Quarry in Scotland. Our Technical department successfully offered a Design which worked for the client giving them the practicality to install quickly on site in challenging conditions over a large Quarry pool.
The Bridge was manufactured in 5 main sections generally from heavy RSA and UC steel ranging from 10-18m with supporting trestle structures.
Adey Steel continued to work closely with the installation team who completely cladded the Bridge on site at the Painters prior to final delivery onto Scotland.